Search
Showing results for 231 - 240 of 531
Hydro Ottawa to participate in IESO province-wide voltage reduction test
The voltage reduction tests, conducted by the Independent Electricity System Operator (IESO), are not expected to have any negative effects on electricity consumers.
Image

Power planning for the future: Near and far(haven)
Barrhaven...or as some locals affectionately call it: Far Haven, was once a small rural neighbourhood in the City of Nepean when it was established in the 1960s.
Image

Sump pumps 101
As winter gives way to spring thaw, some Ottawa residents are bracing for the challenges of meltwater after an exceptionally snowy season.
Image

Six hands-on energy-related activities for kids this summer
From the outside looking in, it can appear that kids received their summer break early with the risks of COVID-19 prompting schools to close.
Image

Don’t be shocked: People should stay clear of power lines
Sure, when power’s out, you want it back – and may even want to help – but it’s not worth risking a life.
Image

Hydro Ottawa invites customers to shape Ottawa’s energy future together
OTTAWA – September 16, 2024 – Hydro Ottawa is inviting its customers to play a key role in shaping the future of Ottawa's energy landscape.
Image

Maintenance covers and Hydro Ottawa’s chamber of secrets
Each day, thousands of Ottawa residents step outside to walk, bike and drive along the city streets. You need not to look far to see the hustle and bustle of activity.
Image

All Charged Up
Owning an electric vehicle (EV) these days isn’t any more complicated than owning a gasoline one. In fact, the argument could be made that it’s easier from a “fuel” perspective.
Image

Westin Ottawa makes sustainability a permanent guest
The hotel is well on its way to becoming one of the first Westin hotels to achieve long-term sustainability with its 30/20 by 2020 conservation plan.
Image

Bilberry Cable Renewal Project
May 2023 - December 2024
The Bilberry Cable Renewal Project is being completed as an essential requirement to replace the underground equipment to maintain the electricity capacity requir
Image
